3 important steps to make you're WLAN project successful


3 important steps to make you're WLAN project successful

Throughout the many years that we have been in the business, we have seen many different approaches on how WLANs are deployed. Sometimes they were successful and sometimes they were not. If you are involved in the WLAN project from A to Z the flow is transparent. Otherwise, depending from where you step into the story, you are always dependent on third party information which, is sometimes contradictional with what you are doing onsite. Our part of the story was mostly the pre-installation site survey which is a crucial part of the whole but somewhat useless if, for example, the information regarding the WLAN applications that will be deployed on the WLAN is not correct.

Another thing that we noticed was that after the site survey was executed and documented, the WLAN infrastructure would be installed and no fine tuning or verification site survey would be performed before the deployment of the WLAN applications which, from our point of view, is another crucial part of the whole. For example, during the site survey measurements were taken while the access points are transmitting at a certain static tx power level and after installation the radio management algorithm of the controller (if architecture is controller based) will feel the access points and adjust channel and tx power settings automatically. Depending on the building infrastructure and the access point density, the radio management algorithm could lower down the tx power of the access points below the threshold used during the site survey. This could cause coverage holes in the coverage area. Another example is that the access points are installed incorrectly according to the site survey recommendations and the radio pattern will be different than as foreseen.

With all this in mind, we want to stress out the following 3 important steps to achieve a successful WLAN project.

Step1: Information gathering
I guess all WLAN engineers who are doing site surveys have heard this one "I want a site survey, for everything" ;-).
Step 1 is probably the most important step. Gathering information about the WLAN project, such as defining coverage areas, which type of applications will be used now and in the nearby future and in which frequency, high capacity areas, high utilization areas, WLAN vendor and type of access points, aesthetic restrictions for the placement of access points, and so on. I know….. it is a true hassle to collect all the information and sometimes the customer does not know what you're talking about.
The best way to do this is to fill out the Request For Information document. All of the questions to get the information are in there. You just need to fill in the check boxes.

Step2: The Pre-installation (onsite) site survey
Once all of the information gathered from the RFI you can actually start doing the onsite measurements. A small kick-off meeting with the customer onsite to double check the information won't do any harm.

The goal of the onsite site survey is to pinpoint the amount of access points and/or antennas needed to meet the requested WLAN requirements, as well as how and where the APs should be installed.
A spectrum analyses is also required to check if there is any non Wi-Fi interference onsite that could disrupt the performance of the new WLAN infrastructure.
Rogue access points/signals detection can be an additional option to the WLAN site survey.
All the results will be documented.

Step3: The verification site survey (post installation site survey)
Most of the times Step3 is not foreseen in the project due to budgetary or other reasons or there might be a time gap between the pre-installation site survey an and the installation of the WLAN infrastructure. And I agree, most of the deployments will have no problems running their WLAN applications certainly if they are only data applications, but that does not mean that you're WLAN is performing in the most optimal conditions. When adding more and more applications, performance problems can arise. Anyway, we highly recommend adding Step3 in the process before the project will go live.

The goal of the verification site survey is to optimize and fine-tune the overall WLAN to the requested WLAN requirements. Coverage, retry percentage, tx power settings, data rates, channel reuse and AP installation should all be taken into consideration.
All results will be documented.

Cheers,
Joeri De Winter

0 comments:

About Us

Skyline networks is specialized in a professional range of wireless LAN services worldwide. We offer customized services for every aspect of your WLAN.

The Skyline Blog Authors:

Joeri De Winter
Justin Cetko

Joeri De Winter

Follow Joeri

Justin Cetko

Follow Justin

Twitter feed